Batching plant system and feed ingredients should be based on the duration of the project, the concrete total daily Concrete amount indicators to config, in order to meet the daily maximum concrete dosage.a mixer and refering to the batching system for a production line.General engineering can only be set a production line, a large and important project should be set two production lines, arranged in parallel, in order to ensure uninterrupted supply of concrete for the project.
 
Yard area of sand and stone should be large enough to meet the engineering consumption need and can facilitate the organization feed supplement; gravel partition stacked to prevent mixing caused concrete graded not being allowed; feed with loaders and gravel were neatly stacked; venue to be hardening, convenient loading trucks loading and prevent dirt and other debris into the material.
 
A batching plant should be configured about 1-2 pools,in order to ensure of cleaning concrete mixer and mechanical.A production line with at least two compatible cement silos.If three cement silos can be configured.that will be better. This can be used in turn to meet the concrete needs of the production Timely and not make cement.The large volume and pumping concrete normally needs fly ash and admixtures,and they were placed according to the situation, in order to facilitate the use.
 
For the transport way of the finished concrete, you can choose concrete pump.the method of transportation is based on meeting the transport distance,height and amount of concrete supplying.Generally,it can be layout in front of concrete batching plant,use pump tube connecting to the pouring ground.
 

Contact Us

FreeWebSubmission.com